Chesapeake Public Operations Building

City of Chesapeake 

This 3 story facility will house 100 staff comprising The City of Chesapeake's Fire Department chiefs, Police Department Chiefs, Office of Emergency Management, Office of Information Technology, 911 call center, Emergency Operations Center, and fire training administration. Bayside Concrete installed the pile cap grade beam foundations, structural wall foundations, stairs, vehicle ramps, CIP stairs, slab on grade,and slab on metal deck. Bayside also formed and poured 346 yards worth of colored walls all around the building including a 16 foot colored wall enclosing the vehicle maintenance area.

General Contractor

McKenzie Construction

Total Building Area

51,000 SF

Concrete Work Duration

August 2015

Total Concrete Poured

2,693 cubic yards

Superintendent

Rob Ouellette