TopGolf Driving Range & Entertainment Facility
Greenwich Road - Virginia Beach
TopGolf is a 3 story premier golf entertainment complex that features 102 bays overlooking a 240 yard driving range, 3 bars, event space, 2 kitchens, and office space. Bayside Concrete installed the footings, foundations, elevator walls, pan stairs, large retaining walls, radius achitectural walls, 6" slab on grade, CIP walls, radius planters, slab on metal deck, topping slab, light pole bases, handicap ramps, facade walls, and target pits. Bayside also installed 107 LF of target wall and 15,000 SF of paving.
General Contractor
ARCO Construction
Total Building Area
66,000 SF
Concrete Work Duration
April 2015
Total Concrete Poured
2,350 cubic yards
Superintendent
Norman Booker